  • Devon Energy Medium Voltage MCC Upgrade

Devon Energy Medium Voltage MCC Upgrade

  • October 24th, 2014

This project consisted of replacing an existing 4160V motor control center using across-the-line starters with a new Motortronics motor control center using reduced-voltage solid-state (RVSS) starters. The work was coordinated with plant outages and […]

  • Anadarko – Medicine Bow Facility Arc Flash Study

Anadarko – Medicine Bow Facility Arc Flash Study

  • June 2nd, 2014

Performed and Arc Flash Hazard Analysis and Coordination study for the 480V system at Plant 1 of the Medicine Bow Treating Facility. Coordinated breaker settings were provided to Anadarko along with Arc Flash Labels […]